Wireframe view of a data hall: two rows of racks around a contained hot aisle, four coolers along the wall, with air drawn as light.

The optimization AI for data centers.

Every watt · every litre · every degree.

Most halls run colder than they need to, just in case. Parity finds the most efficient setting for every unit that stays inside your limits, around the clock, and shows you why.

Press and hold, or hold Space Skip the tour

Cold air

Four indirect evaporative coolers push air into the hall. Parity tracks the electricity and water each one uses.

Racks

Parity estimates the inlet temperature of all 48 racks. The limit is 27 °C, and even the hottest rack should stay at least 1 °C below it.

Hot aisle

Air leaving the racks collects in the contained aisle and returns to the coolers through the ceiling. The warmer that return air, the less the coolers have to work.

Move the supply air temperature

Weather

Outdoor 34 °C · 20% RH · 15:00

22.0 °C
An example hot-aisle contained hall with four indirect evaporative coolers, in our digital twin. Coolers Ceiling plenum Hot aisle Racks Cold aisle

Cooling power
26.3 kW
Water
0.29 m³/h
Hottest rack inlet
22.0 °C

All rack inlets are inside the limit.

An example hot-aisle contained hall with four indirect evaporative coolers, in our digital twin. The most efficient setting that keeps every rack safely under the limit, even with one cooler off.

Data centers pay for cold they don't need

ASHRAE recommends rack inlet temperatures between 18 and 27 °C. Many operators sit near the bottom of that range because nobody can see what a warmer setting would do.

Cooling is one of the largest energy costs in a data center. Weather, load and equipment change hour by hour, so a fixed setting usually costs more than it needs to.

Identical units also drift apart. One switches to compressor cooling while its neighbour doesn't, and the reason stays hidden in the BMS.

What Parity does

Parity console: a 3D twin of a hall with four coolers and a contained hot aisle, showing rack inlets and sensors.
Screens from the Parity console (Turkish interface).

How it works

  1. Build the twin

    A physical model of your halls: airflow, pressure, humidity and every cooler.

  2. Fit it to your site

    With read-only data from the BMS, the twin learns to behave like your hall.

  3. Decide with a look ahead

    A neural network proposes settings, and the twin tests them against the coming weather and tariffs.

  4. Advise first

    Parity starts by recommending. Operators approve, and Parity learns from what they accept.

  5. Close the loop when you're ready

    Parity moves from limited to full control and always stays inside the limits operators set.

Parity in two minutes

Read the transcript

Every second, the internet turns electricity into heat.

This machine fights it with water and air.

Most of the year, no compressor. Just physics.

Data centers run them as twins.

Same model. Same air. Same job.

One of them... changes.

No alarm. Nothing breaks.

On every screen, everything looks fine.

It just quietly burns three times the energy.

For months.

Parity's AI compares every twin against physics,

and tells you why.

But the biggest waste isn't broken.

Data centers run cold. Just in case.

Inside the safe range, nobody touches a thing.

Parity's AI does.

Every unit. Every hour. Every degree.

It never sleeps.

Water or electricity? The cheapest way to stay cool changes every hour.

Parity weighs tariffs, weather and your water targets, then picks the mode.

And it works with you.

It suggests. You approve.

Ask it why, and it answers with data.

Every decision teaches it your site.

Parity. The optimization AI for data centers.

What we are aiming for

We run Parity in full control in our digital twin, on facilities it has never seen and across every season. The results so far are in line with these goals.

the cooling energy saving we are aiming for
15–20%
minutes with a rack inlet above the limit
0
safe settings even with one cooler off
N-1
new decisions as weather and load change
24/7

Our first pilot will measure these goals at a real facility.

Team

Request a pilot

We're looking for a first data center to run Parity in advice mode on historical data. Tell us about your site.

You are

How we use this information