Finds faults nobody sees
Compares identical units with each other and with the twin, then says why one of them behaves differently and what a technician should check first.
Every watt · every litre · every degree.
Most halls run colder than they need to, just in case. Parity finds the most efficient setting for every unit that stays inside your limits, around the clock, and shows you why.
Four indirect evaporative coolers push air into the hall. Parity tracks the electricity and water each one uses.
Parity estimates the inlet temperature of all 48 racks. The limit is 27 °C, and even the hottest rack should stay at least 1 °C below it.
Air leaving the racks collects in the contained aisle and returns to the coolers through the ceiling. The warmer that return air, the less the coolers have to work.
Outdoor 34 °C · 20% RH · 15:00
All rack inlets are inside the limit.
ASHRAE recommends rack inlet temperatures between 18 and 27 °C. Many operators sit near the bottom of that range because nobody can see what a warmer setting would do.
Cooling is one of the largest energy costs in a data center. Weather, load and equipment change hour by hour, so a fixed setting usually costs more than it needs to.
Identical units also drift apart. One switches to compressor cooling while its neighbour doesn't, and the reason stays hidden in the BMS.
Compares identical units with each other and with the twin, then says why one of them behaves differently and what a technician should check first.
Picks supply and return setpoints for the weather and load right now, checks every candidate against the twin first, and keeps a safety margin.
Weighs electricity tariffs, water price and your water targets to decide, unit by unit, between dry, evaporative and compressor modes.
Operators can ask the copilot why a decision was made. The answer comes from the twin, the site history and the measurements.
A physical model of your halls: airflow, pressure, humidity and every cooler.
With read-only data from the BMS, the twin learns to behave like your hall.
A neural network proposes settings, and the twin tests them against the coming weather and tariffs.
Parity starts by recommending. Operators approve, and Parity learns from what they accept.
Parity moves from limited to full control and always stays inside the limits operators set.
Every second, the internet turns electricity into heat.
This machine fights it with water and air.
Most of the year, no compressor. Just physics.
Data centers run them as twins.
Same model. Same air. Same job.
One of them... changes.
No alarm. Nothing breaks.
On every screen, everything looks fine.
It just quietly burns three times the energy.
For months.
Parity's AI compares every twin against physics,
and tells you why.
But the biggest waste isn't broken.
Data centers run cold. Just in case.
Inside the safe range, nobody touches a thing.
Parity's AI does.
Every unit. Every hour. Every degree.
It never sleeps.
Water or electricity? The cheapest way to stay cool changes every hour.
Parity weighs tariffs, weather and your water targets, then picks the mode.
And it works with you.
It suggests. You approve.
Ask it why, and it answers with data.
Every decision teaches it your site.
Parity. The optimization AI for data centers.
We run Parity in full control in our digital twin, on facilities it has never seen and across every season. The results so far are in line with these goals.
Our first pilot will measure these goals at a real facility.
Founder
Data center operations engineer and final-year electrical and electronics engineering student at Gazi University. Built Parity's twin, diagnosis and decision engines, and the console.
Emre Kurt on LinkedIn
Co-founder
International relations student at Ankara Hacı Bayram Veli University. Handles support programs, regulation, and investor and customer relations.
We're looking for a first data center to run Parity in advice mode on historical data. Tell us about your site.